Designed for Purchasing Managers, Technical Directors, and Operations Leaders who need reliable, high‑power storage without the usual price‑performance trade‑offs.
Get Free Quote in 24 hIn 2025‑2026 the global industrial gases market surpassed USD 115 billion, and utilities are scrambling to pair renewable generation with utility‑scale energy storage systems. Yet most buyers still confront the same three blockers:
According to the IEA Global Hydrogen Review 2024, blue‑hydrogen‑enabled storage projects experience a 25 % cost premium when logistics are not optimized. That translates directly into higher electricity arbitrage margins needed just to break even.
If you keep paying for “standard” solutions, you’ll miss the next wave of low‑cost, high‑density storage that can shave months off your renewable curtailment.
See the SolutionShijiazhuang Enric Gas Equipment Co., Ltd. leverages 50 years of pressure‑vessel expertise to deliver storage platforms that meet ASME, DOT, CE, and ISO 9001 standards while offering OEM/ODM flexibility, rapid 4‑week delivery, and a risk‑free sample program.
| Parameter | Li‑Ion (NMC) | Na‑Ion (Prussian Blue) | Flow (Vanadium Redox) |
|---|---|---|---|
| Nominal Capacity | 2 MWh per container | 2 MWh per container | 5 MWh per 40‑ft tank |
| Energy Density | 350 Wh/kg | 180 Wh/kg | 45 Wh/kg (electrolyte) |
| Round‑Trip Efficiency | 96 % | 92 % | 78 % |
| Operating Temperature | ‑20 °C ~ +60 °C | ‑10 °C ~ +55 °C | +5 °C ~ +45 °C |
| Safety Standard | UL 1973, IEC 62619 | UL 1973, IEC 62619 | IEC 61851‑2, NFPA 70 |
| Lifetime (Full Cycles) | 4000 cycles @ 80 % DOD | 3000 cycles @ 80 % DOD | 15000 cycles @ 50 % DOD |
| Control Interface | Modbus‑TCP/IP, DNP3, IEC 61850 | Modbus‑TCP/IP, DNP3 | OPC‑UA, Modbus‑RTU |
Our systems have been deployed in three distinct market segments, each with measurable ROI:
Result: Customers consistently achieve 15‑30 % lower Levelized Cost of Storage (LCOS) compared with legacy Chinese units.
Read Trusted Customer Proof
types-of-energy-storage-system sustainable-energy-storage utility-energy-storage thermal-storage-system
Standard modules ship within 4 weeks after PO confirmation. For OEM‑customized BMS or fire‑safety packages, we add 1‑2 weeks, still well under the industry average of 8‑12 weeks.
Yes. All units support Modbus‑TCP/IP, DNP3, and IEC 61850. Our engineering team provides a plug‑in script for major EMS vendors (OSIsoft PI, Schneider EcoStruxure, ABB 800xA).
We partner with GE Capital and HSBC Trade Finance to offer zero‑interest, 5‑year lease‑to‑own structures. Documentation is compliant with US GAAP and IFRS.

Our logistics team prepares all required CE, FCC, and US DOT paperwork. For EU shipments we use the Incoterm DDP model, guaranteeing that duties are prepaid.
You receive a dedicated Account Engineer, 24/7 remote monitoring, annual on‑site health checks, and a 30‑day on‑site spare‑part guarantee. All service contracts are ISO 9001‑audited.
Limited‑time offer: Free 5 kWh demonstration module shipped within 7 days + money‑back guarantee if capacity drops below 95 % after 30 days.
Or fill the short form below – we’ll reply within 2 hours.
David Kim, Procurement Lead, Hyundai Energy – “The 8‑week delivery shattered our timeline. ROI calculations now show a 3‑year payback instead of 5‑year.”
Linda Patel, Operations Manager, National Grid (UK) – “After 12 months the system still operates at 96 % capacity, far better than the 85 % we expected from the spec sheet.”
Marco Rossi, Technical Director, Enel Green Power – “Integration with our solar‑farm SCADA was painless thanks to the open IEC 61850 API.”
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
“Enric’s modular containers cut our deployment time from 8 months to 6 weeks and delivered a 27 % cost reduction on the total project.” – James Liu, Senior Procurement Manager, Shell Energy
“The 10‑year warranty gave us confidence to finance a 50 MWh battery park. After 18 months we are still at 97 % capacity – exactly as promised.” – Maria Gomez, Technical Director, Siemens Energy