Cut energy‑cost volatility by up to 35% in 12 months – the ultimate solution for purchasing managers, technical directors, and operations leaders who need reliable, on‑site power.
Designed for factories, data‑centers, and large‑scale logistics hubs across the USA and Europe.
Get Free Quote in 24 hThese pain points translate directly into lost production, higher per‑unit costs, and tighter margins for you.
See the DER SolutionShijiazhuang Enric Gas Equipment Co., Ltd. offers a complete DER portfolio – from modular high‑pressure hydrogen storage to on‑site micro‑CHP units – backed by ASME, DOT, CE, ISO 9001, and FCC certifications.
| Model | Power Rating | Fuel Type | Efficiency | CO₂ Emissions | Certifications |
|---|---|---|---|---|---|
| DER‑A100 | 100 kW | Natural Gas | 38 % (HHV) | 0.45 kg/kWh | ASME, CE, ISO 9001 |
| DER‑H250 | 250 kW | Hydrogen (Blue) | 45 % (HHV) | 0.12 kg/kWh | ASME, DOT, ISO 9001, FCC |
| DER‑G500 | 500 kW | Green Hydrogen (Electrolyzer) | 48 % (HHV) | 0 g/kWh | ISO 9001, CE, RoHS |
| DER‑RNG200 | 200 kW | Renewable Natural Gas | 42 % (HHV) | 0.05 kg/kWh | ISO 9001, CE, GS |
All modules are pre‑engineered for OEM/ODM customization – you can request specific pressure ratings, control‑system interfaces (Modbus/TCP, OPC UA), or remote‑monitoring dashboards.
DERs are small‑to‑mid‑scale generation, storage, or demand‑response assets located close to the point of use. Unlike centralized plants, they can be modular, quickly installed, and often run on low‑carbon fuels (hydrogen, RNG, solar). This reduces transmission losses and improves grid resilience.
Yes. Our DER‑H250 and DER‑RNG200 modules are designed for seamless tie‑in with standard ASME‑rated pipelines. Retrofit kits include pressure‑regulating valves, SCADA interfaces, and safety‑shutdown logic compliant with DOT and CE standards.
Factory‑built modules are shipped within 10 working days after order confirmation. On‑site commissioning, including grid interconnection and performance testing, is completed in 3‑4 weeks, giving you a total lead‑time of under 6 weeks.
Our export team holds CE, ISO 9001, and FCC certifications, and we work with local agents (e.g., Bowen Di for Europe, Jeremy Wu for North America) to secure CE‑Mark, VDE, and US‑specific UL approvals. All documentation (COA, test reports) is provided before shipment.
We offer flexible terms: 30 % upfront, 70 % on delivery; L/C, T/T, or open‑account for approved buyers. For qualified projects, we can arrange vendor‑financed leases with a 5‑year pay‑back period, aligning CAPEX with OPEX savings.

Yes. Our 24 / 7 remote‑monitoring center monitors performance metrics in real time. On‑site maintenance contracts are available in the U.S., EU, and Asia‑Pacific, with a guaranteed 99.5 % uptime SLA.
Limited‑time Offer: First‑time buyers receive a FREE 30‑day trial unit (up to 250 kW) plus a money‑back guarantee if performance targets are not met.
Choose your preferred contact method:
David P., Operations Manager, ABB
“The DER‑G500 cut our peak‑demand charges by 28 % and the remote dashboard lets us fine‑tune loads in real time.”
Laura S., Purchasing Director, BASF
“Fast delivery and OEM‑ready design saved us six months on our expansion schedule. The ISO‑9001 audit was flawless.”
Michael T., CTO, Tesla Energy
“Hybrid hydrogen‑natural‑gas DERs gave us a reliable backup without compromising our carbon‑neutral pledge.”
These screenshots demonstrate our rapid response times (under 2 minutes) and the technical depth our sales engineers provide.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
Our DER portfolio powers facilities for more than 40 multinational brands.