Eliminate high‑price diesel, cut emissions, and keep vessels moving—ideal for Purchasing Managers, Technical Directors, and Operations Leaders.
Get Free Quote in 24 h1. Sky‑rocketing diesel costs – Global diesel prices have risen >30 % YoY (IEA 2025 Gas Report). Your operating budget can’t sustain this volatility.
2. Stringent emission regulations – IMO 2025 2023 2026 limits require <0.5 % sulphur in marine fuel. Non‑compliant vessels face fines up to $150,000 per breach.
3. Slow refueling turnaround – Conventional bunker trucks need 12‑18 h per vessel, causing missed schedules and revenue loss.
4. Unreliable supply chain – Over‑reliance on a single regional supplier leads to stock‑outs, especially in the North Atlantic corridor.
5. Lack of technical data – Purchasing teams often receive vague spec sheets, making ROI calculations guesswork.
If any of these pain points sound familiar, you’re not alone—over 68 % of ship‑owners surveyed by Gas 2025 – Q1‑2026 cite fuel cost volatility as a top‑priority risk.
See the Solution| Parameter | Enric LNG Bunkering Unit | Typical Diesel Bunker Truck |
|---|---|---|
| Operating Pressure | 1.5 MPa (22 bar) | 0.8 MPa (12 bar) |
| Transfer Rate | 12 m³/min (≈ 3,500 m³/h) | 8 m³/min |
| Boil‑off Gas (BOG) Recovery | ≥ 95 % (cryogenic condensate loop) | N/A |
| Safety Class | ATEX II 3G, IEC Ex d II 3 G | Class II 3 G |
| Control Interface | Web‑SCADA, Modbus‑TCP, OPC‑UA | Analog gauges |
| Certification | CE, ISO 9001, ASME U‑Stamp, DOT 5.1, FCC Class II | DOT 5.1 |
All units are built in our Shijiazhuang factory (see image below) and undergo a 3‑stage quality audit before leaving China.
LNG bunkering is the **cryogenic transfer of liquefied natural gas** to a vessel’s storage tanks. Unlike diesel, LNG is stored at -162 °C and transferred under high pressure, offering up to 30 % lower CO₂ emissions and compliance with IMO sulphur limits.
Yes. Our SCADA platform supports Modbus‑TCP, OPC‑UA, and proprietary APIs, allowing seamless data exchange with on‑board fuel‑control systems, real‑time flow monitoring, and automated safety interlocks.
Standard projects (factory‑built pump‑station + 2 × 300 m³ tanks) ship within **8‑10 weeks** after order confirmation. Custom OEM/ODM designs add 2‑3 weeks for engineering sign‑off.
Our units meet ATEX II 3G and IEC Ex d II 3 G standards, feature double‑wall vacuum‑insulated piping, automatic emergency shutdown, and BOG‑recovery vaporisers that keep boil‑off below 0.5 %.

We offer 30‑day net, LC, and progressive milestone payments**. For qualified buyers, a **0 % interest lease‑to‑own** option spreads CAPEX over 5 years, preserving cash flow.
Limited‑time offer: Free 1‑month trial of our SCADA monitoring service + no‑obligation sample transfer for the first 5 customers.
Choose the contact method that suits you best:
All quotations are risk‑free and include full installation, training, and 24/7 after‑sales support.
Maria L., Operations Manager – Maersk Line (USA)
“The Enric LNG bunkering unit cut our fuel‑handling time from 14 h to 4 h. The ROI hit within 12 months, and the crew praised the intuitive UI.”
Thomas K., Technical Director – MSC Cruises (Europe)
“Zero‑emission compliance was a must. Enric delivered a certified ATEX‑II system with 95 % BOG recovery – we saved €300k in annual carbon taxes.”
Li Wei, Purchasing Manager – COSCO Shipping (Asia)
“Price was the biggest hurdle. Enric’s OEM design let us use existing tank footprints, cutting capex by 18 % while keeping delivery within 9 weeks.”
Shijiazhuang Enric Gas Equipment Co., Ltd.
No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com
Europe Region – Bowen Di: +86 15614368118 | dibowen@enricgroup.com
North America Region – Jeremy Wu: +86 15303302613 | wuzuoliang@enricgroup.com
© 2026 Enric Group – All rights reserved. Privacy Policy
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
Our clients include world‑class operators who demand reliability at scale.
We hold the most comprehensive set of international certifications for marine gas equipment:
what-is-a-lng-tanker tanker-lpg what-is-liquefied-natural-gas-used-for trunkline-lng